Cost of Restoration Analysis


Site Name: Estimated Restoration Cost $:


General Location (County, township, city, nearest roadway, ect.)
Land Designation: State/County/City Park, State/County/city forest Designated Non-mtrzd Trl, Other Public Land
Map Reference and/or GPS Coordinates:
Ecosystem Type:

Approximate Area/Trail Miles:

Date:


SPACE FOR PHOTO. Please attach in an email to info@mnresponsiblerec.org



Desciption of damage:
DESCRIPTION OF DAMAGE:
Soil erosion: visible evidence of water flowing downhill,
soil displacement, soil loss, creating gullies or trenches in soil
surface, turbidity and/or sedimentation in streams or other water sources
Vegetation loss and soil compaction: hard,
compacted surface (difficult to penetrate with finger, stick or pen)
Rutting: trenches created by OHV tires
Estimated Restoration Costs
a. Disturbance to habitat or project area minimal.
Erosion potential minimal. Seeding only.
Costs based on 1/2 mile trail repair increments.
Site prep, seed and seeding as specified.
mile(s) X $1600.00 per 1/2 mile trail = $
b. Disturbance to habitat or project area moderate, Erosioon potential moderate. Smoothing and seeding required. Costs based on 1/2 mile trail repair increments. Site prep, seed, seeding and mulching as specified
mile(s) X $2000.000 per 1/2 mile trail = $
c. Disturbance to habitat or project area severe, fill needed.
erosion potential severe. Smoothing and seeding required.
Costs based on 300 ft. trail repoair increments. Site prep, seed, seeding and eroision control as specified.
fee X $3500.00 per 300 ft. trail = $

TOTAL estimated cost to restore site: $
Comments:

MRR, P.O. Box 111, Duluth, MN 55801

Tel: 218-740-3175, Fax: 218-740-3179

Email: info@MnResponsibleRec.org

Copyright 2003